{"id":8573,"date":"2022-03-10T20:30:40","date_gmt":"2022-03-10T20:30:40","guid":{"rendered":"https:\/\/www.hexorcism.com\/19BP\/sm2333653\/"},"modified":"2022-03-10T20:30:40","modified_gmt":"2022-03-10T20:30:40","slug":"sm2333653","status":"publish","type":"page","link":"https:\/\/www.hexorcism.com\/19BP\/sm2333653\/","title":{"rendered":"CENTER PILLAR AND SIDE SILL REMOVAL [PANEL REPLACEMENT]"},"content":{"rendered":"<div class=\"detailsTabContent\">\n<h3 class=\"c1\">CENTER PILLAR AND SIDE SILL REMOVAL [PANEL REPLACEMENT]<\/h3>\n<\/div>\n<p>SM2333653<\/p>\n<div class=\"node SERVICE_MANUALS\"><\/p>\n<div class=\"textleft\">\n<div class=\"attr CONTENT content c2\">\n<hr \/>\n<p class=\"servinfo-title-id\" align=\"right\">id098008753900<\/p>\n<p><br clear=\"all\" \/><br \/>\n<a name=\"id09800875390001\" id=\"id09800875390001\"><\/a><\/p>\n<p class=\"servinfosub-title\">Symbol Mark<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am6zzb00000392.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am6zzb00000392<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><br clear=\"all\" \/><br \/>\n<a name=\"id09800875390002\" id=\"id09800875390002\"><\/a><\/p>\n<p class=\"servinfosub-title\">Removal Procedure<\/p>\n<p><br clear=\"all\" \/><\/p>\n<p><a name=\"id09800875390003\" id=\"id09800875390003\"><\/a><\/p>\n<p class=\"topic-title\">Side Sill (Front-side)<\/p>\n<p class=\"list\">1.Rough cut the 2 locations in areas A shown in the figure.<\/p>\n<p class=\"list\">\n<p class=\"list\">2.Drill the spot welds in the 18 locations in area B shown in the figure.<\/p>\n<p class=\"list\">\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000461.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000461<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"list\">3.Remove the cabin side frame (outer) (side sill (outer)).<\/p>\n<p class=\"list\">\n<p><br clear=\"all\" \/><\/p>\n<p><a name=\"id09800875390004\" id=\"id09800875390004\"><\/a><\/p>\n<p class=\"topic-title\">Center pillar and side sill component<\/p>\n<dl>\n<dd>\n<div class=\"attention2-label\">Caution<\/div>\n<\/dd>\n<dd>\n<div class=\"attention2\">\n<div class=\"list\">\u2022 To prevent injury, remove the curtain air bag module before performing the work.<\/div>\n<p class=\"figure-title\">4SD<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000406.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000406<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"figure-title\">5HB<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000407.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000407<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/dd>\n<\/dl>\n<dl>\n<dd>\n<div class=\"attention2-label\">Caution<\/div>\n<\/dd>\n<dd>\n<div class=\"attention2\">\n<div class=\"list\">\u2022 If cutting work is done using flame, a fire could occur because insulators are inserted in the locations shown in the figure. When performing the cutting work near the insulator insert areas, avoid using flame and use an air saw or drill.<\/div>\n<p class=\"figure-title\">4SD<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000500.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000500<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"figure-title\">5HB<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000553.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000553<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/dd>\n<\/dl>\n<p class=\"list\">1.Rough cut area A shown in the figure.<\/p>\n<p class=\"list\">\n<p class=\"list\">2.Drill the spot welds in the 1 location in area B shown in the figure.<\/p>\n<p class=\"list\">\n<p class=\"list\">3.Insert a chisel into the position of the arrow shown in the figure, peel off the weld bond, and then move the end of the dash (upper) panel.<\/p>\n<p class=\"list\">\n<p class=\"list\">4.Drill the spot welds in the 2 locations in area C shown in the figure.<\/p>\n<p class=\"list\">\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000769.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000769<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"list\">5.Rough cut area D shown in the figure.<\/p>\n<p class=\"list\">\n<p class=\"list\">6.Insert a chisel into the position of the arrow shown in the figure, peel off the weld bond, and then move the cut off part of the side frame outer (front pillar outer).<\/p>\n<p class=\"list\">\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000770.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000770<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"list\">7.Rough cut the 2 locations in areas E shown in the figure.<\/p>\n<p class=\"list\">\n<p class=\"figure-title\">4SD<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000501.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000501<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"figure-title\">5HB<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000554.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000554<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"list\">8.Drill the spot welds in the 139 locations (4SD), 138 locations (5HB) in area F shown in the figure.<\/p>\n<p class=\"list\">\n<p class=\"figure-title\">4SD<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000502.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000502<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"figure-title\">5HB<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000555.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000555<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"list\">9.Insert the chisel into the location in area G shown in the figure and peel off the weld bond adhering to the wheel arch line.<\/p>\n<p class=\"list\">\n<p class=\"figure-title\">4SD<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000556.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000556<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"figure-title\">5HB<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000558.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000558<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"list\">10.Remove the cabin side frame (outer) (front pillar (outer), center pillar (outer) and side sill (outer)).<\/p>\n<p class=\"list\">\n<dl>\n<dd>\n<div class=\"attention2-label\">Caution<\/div>\n<\/dd>\n<dd>\n<div class=\"attention2\">\n<div class=\"list\">\u2022 If cutting work is done using flame, a fire could occur because insulators are inserted in the locations shown in the figure. When performing the cutting work near the insulator insert areas, avoid using flame and use an air saw or drill.<\/div>\n<p class=\"figure-title\">4SD<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000503.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000503<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"figure-title\">5HB<\/p>\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000557.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000557<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/dd>\n<\/dl>\n<p class=\"list\">11.Drill the spot welds in the 20 locations in area H shown in the figure.<\/p>\n<p class=\"list\">\n<dl>\n<dd>\n<div class=\"attention3-label\">Note<\/div>\n<\/dd>\n<dd>\n<div class=\"attention3 list\">\u2022 When drilling the spot welds in the 20 locations in area H shown in the figure, do not drill through-holes in consideration of the workability when installing.<\/div>\n<\/dd>\n<\/dl>\n<p class=\"list\">12.Drill the spot welds in the 4 locations in area I shown in the figure.<\/p>\n<p class=\"list\">\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000504.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000504<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"list\">13.Remove the hinge reinforcement.<\/p>\n<p class=\"list\">\n<p class=\"list\">14.Drill the spot welds in the 9 locations in area J shown in the figure.<\/p>\n<p class=\"list\">\n<dl>\n<dd>\n<div class=\"attention3-label\">Note<\/div>\n<\/dd>\n<dd>\n<div class=\"attention3 list\">\u2022 When drilling the spot welds in the 9 locations in area J shown in the figure, do not drill through-holes in consideration of the workability when installing.<\/div>\n<\/dd>\n<\/dl>\n<p class=\"list\">15.Drill the spot welds in the 54 locations in area K shown in the figure from the interior.<\/p>\n<p class=\"list\">\n<p class=\"list\">16.Drill the spot welds in the 43 locations in area L shown in the figure.<\/p>\n<p class=\"list\">\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000560.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000560<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"list\">17.Remove the center pillar reinforcement and side sill reinforcement (front) at the same time.<\/p>\n<p class=\"list\">\n<p class=\"list\">18.Drill the spot welds in the 15 locations in area M shown in the figure.<\/p>\n<p class=\"list\">\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000507.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000507<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"list\">19.Remove the side sill reinforcement (rear).<\/p>\n<p class=\"list\">\n<p class=\"list\">20.Drill the spot welds in the 8 locations in area N shown in the figure from the interior.<\/p>\n<p class=\"list\">\n<table class=\"figure-flame-non table-flame\">\n<tbody>\n<tr>\n<td>\n<table class=\"figure-non-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/am3zzb00000508.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">am3zzb00000508<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"list\">21.Remove the center pillar (inner).<\/p>\n<p class=\"list\">\n<\/div>\n<div class=\"ATTACHMENTS\"><\/div>\n<div class=\"attr VTOC_FILENAME content c2\"><!--\n                        am3zz098008b0000103 --><\/div>\n<div class=\"attr SIE_ID content c2\"><!--\n                        id098008753900.ent --><\/div>\n<p><!--\n*****************************\nERROR: Schema not found. TYPE=META REFERENCEKEY=SERVICE_MANUALS ROOT=null\n*****************************\n--><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>CENTER PILLAR AND SIDE SILL REMOVAL [PANEL REPLACEMENT] SM2333653 id098008753900 Symbol Mark am6zzb00000392 Removal Procedure Side Sill (Front-side) 1.Rough cut the 2 locations in areas A shown in the figure. 2.Drill the spot welds in the 18 locations in area B shown in the figure. am3zzb00000461 3.Remove the cabin side frame (outer) (side sill (outer)). Center pillar and side sill component Caution \u2022 To prevent injury, remove the curtain air bag module before performing the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-8573","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/pages\/8573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/comments?post=8573"}],"version-history":[{"count":0,"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/pages\/8573\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/media?parent=8573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}