{"id":10653,"date":"2022-03-10T20:30:58","date_gmt":"2022-03-10T20:30:58","guid":{"rendered":"https:\/\/www.hexorcism.com\/19BP\/sm2841627\/"},"modified":"2022-03-10T20:30:58","modified_gmt":"2022-03-10T20:30:58","slug":"sm2841627","status":"publish","type":"page","link":"https:\/\/www.hexorcism.com\/19BP\/sm2841627\/","title":{"rendered":"OIL CONTROL VALVE (OCV) INSPECTION"},"content":{"rendered":"<div class=\"detailsTabContent\">\n<h3 class=\"c1\">OIL CONTROL VALVE (OCV) INSPECTION<\/h3>\n<\/div>\n<p>SM2841627<\/p>\n<div class=\"node SERVICE_MANUALS\"><\/p>\n<div class=\"textleft\">\n<div class=\"attr CONTENT content c2\">\n<hr \/>\n<p class=\"servinfo-title-id\" align=\"right\">id011000801400<\/p>\n<p><br clear=\"all\" \/><br \/>\n<a name=\"id01100080140001\" id=\"id01100080140001\"><\/a><\/p>\n<p class=\"servinfosub-title\">Coil Resistance Inspection<\/p>\n<p class=\"list\">1.Measure the resistance between terminals A and B using an ohmmeter.<\/p>\n<p class=\"list\">\n<table class=\"figure-flame table-flame\">\n<tbody>\n<tr>\n<td width=\"10mm\"><\/td>\n<td>\n<table class=\"figure-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/bpe5ue00000015.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">bpe5ue00000015<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"spec\">\n<dl>\n<dd>\n<div class=\"list-title\">OCV coil resistance<\/div>\n<\/dd>\n<\/dl>\n<dl>\n<dd>\n<div class=\"list\">6.9\u20147.5 ohms [20\u00b0C {68\u00b0F}]<\/div>\n<\/dd>\n<\/dl>\n<\/div>\n<dl>\n<dd>\n<div class=\"list\">\u2022 If it is not within the specification, replace the OCV.<\/div>\n<\/dd>\n<\/dl>\n<p><br clear=\"all\" \/><br \/>\n<a name=\"id01100080140002\" id=\"id01100080140002\"><\/a><\/p>\n<p class=\"servinfosub-title\">Spool Valve Operation Inspection<\/p>\n<p class=\"list\">1.Verify that the spool valve in the OCV is in the maximum valve timing advance position as indicated in the figure.<\/p>\n<p class=\"list\">\n<table class=\"figure-flame table-flame\">\n<tbody>\n<tr>\n<td width=\"10mm\"><\/td>\n<td>\n<table class=\"figure-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/bpe1ze00000100.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">bpe1ze00000100<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<dl>\n<dd>\n<div class=\"list\">\u2022 If there is any malfunction, replace the OCV.<\/div>\n<\/dd>\n<\/dl>\n<dl>\n<dd>\n<div class=\"attention3-label\">Note<\/div>\n<\/dd>\n<dd>\n<div class=\"attention3\">\n<div class=\"list\">\u2022 When applying battery positive voltage between the OCV terminals, the connection can be either of the following:<\/div>\n<dl>\n<dd class=\"list\">\n<div class=\"list\">\u2015 Positive battery cable to terminal A, negative battery cable to terminal B<\/div>\n<div class=\"list\">\u2015 Positive battery cable to terminal B, negative battery cable to terminal A<\/div>\n<\/dd>\n<\/dl>\n<\/div>\n<\/dd>\n<\/dl>\n<p class=\"list\">2.Apply battery positive voltage between the OCV terminals and verify that the spool valve operates and moves to the maximum valve timing retard position.<\/p>\n<p class=\"list\">\n<table class=\"figure-flame table-flame\">\n<tbody>\n<tr>\n<td width=\"10mm\"><\/td>\n<td>\n<table class=\"figure-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/bpe5ue00000015.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">bpe5ue00000015<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table class=\"figure-flame table-flame\">\n<tbody>\n<tr>\n<td width=\"10mm\"><\/td>\n<td>\n<table class=\"figure-float table-flame\" cellspacing=\"0\">\n<tbody>\n<tr>\n<td align=\"center\"><img decoding=\"async\" src=\"..\/assets\/bpe1ze00000101.png\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"figure-caption\">bpe1ze00000101<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<dl>\n<dd>\n<div class=\"list\">\u2022 If there is any malfunction, replace the OCV.<\/div>\n<\/dd>\n<\/dl>\n<p class=\"list\">3.Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing advance position.<\/p>\n<p class=\"list\">\n<dl>\n<dd>\n<div class=\"list\">\u2022 If there is any malfunction, replace the OCV.<\/div>\n<\/dd>\n<\/dl>\n<\/div>\n<div class=\"ATTACHMENTS\"><\/div>\n<div class=\"attr VTOC_FILENAME content c2\"><!--\n                        bpe5u011000e0000020 --><\/div>\n<div class=\"attr SIE_ID content c2\"><!--\n                        id011000801400.ent --><\/div>\n<p><!--\n*****************************\nERROR: Schema not found. TYPE=META REFERENCEKEY=SERVICE_MANUALS ROOT=null\n*****************************\n--><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>OIL CONTROL VALVE (OCV) INSPECTION SM2841627 id011000801400 Coil Resistance Inspection 1.Measure the resistance between terminals A and B using an ohmmeter. bpe5ue00000015 OCV coil resistance 6.9\u20147.5 ohms [20\u00b0C {68\u00b0F}] \u2022 If it is not within the specification, replace the OCV. Spool Valve Operation Inspection 1.Verify that the spool valve in the OCV is in the maximum valve timing advance position as indicated in the figure. bpe1ze00000100 \u2022 If there is any malfunction, replace the OCV. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-10653","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/pages\/10653","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/comments?post=10653"}],"version-history":[{"count":0,"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/pages\/10653\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.hexorcism.com\/19BP\/wp-json\/wp\/v2\/media?parent=10653"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}