Menu +
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

PROPELLER SHAFT INSPECTION

< Previous Next >

2016 – MX-5 – DriveLine/Axle

PROPELLER SHAFT INSPECTION

1. Remove the bolts.

2. Remove the member bracket. (With member bracket)

3. Remove the bolts.

4. Remove the tunnel member.

5. Remove the propeller shaft (See PROPELLER SHAFT REMOVAL/INSTALLATION.)

6. Measure the runout of the propeller shaft at each position using a dial gauge.

    Maximum runout

  • 0.6 mm {0.02 in}

7. Inspect the play and rotation of the joint by turning the universal joint in the directions shown by the arrows.

    Initial torque (reference)

  • 0.29—0.98 N·m {3.0—9.9 kgf·cm, 2.6—8.6 in·lbf}

< Previous Next >

© 2014 Mazda North American Operations, U.S.A.