Menu +
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

REAR FENDER RAIN RAIL INSTALLATION [PANEL REPLACEMENT]

< Previous Next >

2016 – MX-5 – Body and Accessories

REAR FENDER RAIN RAIL INSTALLATION [PANEL REPLACEMENT]

Symbol Marks

Installation Procedure

1. When installing new parts, measure and adjust the body as necessary to conform with standard dimensions.

2. Drill holes for the plug welding before installing the new parts.

3. After temporarily installing new parts, make sure the related parts fit properly.

4. Plug weld the 1 locations indicated by (A) shown in the figure.

5. Spot weld the 18 locations indicated by (B) shown in the figure, then install the rear fender rain rail.

6. Install the rear fender panel. (See REAR FENDER PANEL INSTALLATION [PANEL REPLACEMENT].)

7. Cut and join the location indicated by (C) shown in the figure.

8. Plug weld the 20 locations indicated by (D) shown in the figure, then install the rear deck panel.

< Previous Next >

© 2014 Mazda North American Operations, U.S.A.