Menu +
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

FRONT HEADER INSTALLATION [PANEL REPLACEMENT]

< Previous Next >

2016 – MX-5 – Body and Accessories

FRONT HEADER INSTALLATION [PANEL REPLACEMENT]

Symbol Marks

Installation Procedure

1. When installing new parts, measure and adjust the body as necessary to conform with standard dimensions.

2. Drill holes for the plug welding before installing the new parts.

3. After temporarily installing new parts, make sure the related parts fit properly.

4. Spot weld the 12 locations indicated by (A) shown in the figure.

5. Plug weld the 2 locations indicated by (B) shown in the figure, then install the front header.

< Previous Next >

© 2014 Mazda North American Operations, U.S.A.