Menu +
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

EFFICIENT INSTALLATION OF BODY PANELS

< Previous Next >

2016 – MX-5 – General Information

EFFICIENT INSTALLATION OF BODY PANELS

Checking Preweld Measurements And Watching

  • Align to the standard reference dimensions, based upon the body dimensions illustration, so that new parts are installed in the correct position.

Welding Notes

  • For the number of weld points, welding should be performed in accordance with the following reference standards.

Spot Welding Notes

  • The shape of the spot welder tip is D=(2×t)+3. If the upper panel thickness is different from that of the under panel, adjust to the thinner one.

  • Because the weld strength is affected by the shape of the spot welder tip, the optimum condition of the tip should always be maintained.

  • Spot welds should be made at points other than the originally welded points.

  • Before spot welding, make a trial weld using the same material as the body panel to check the weld strength.

Checking Weld Strength

  • Installation locations of the engine, chassis, and seat belts are designated as important safety locations for weld strength. Check weld strength by driving a chisel between the panels at every fourth or fifth weld spot, and every tenth regular weld location.

  • Drive the chisel between the panels according to the number of panels as shown below.

  • To determine weld strength, drive the chisel between the panel and check whether the panels come apart. If the panels come apart, make another weld near the original weld.

  • Restore the shape of the checked area.

< Previous Next >

© 2014 Mazda North American Operations, U.S.A.